Cherry Point EMS/Fire Facility
Havelock, North Carolina
GFBA provided civil engineering and landscape architecture services as part of a design/build team selected by Naval Facilities - Mid-Atlantic for a 5-bay, 16,211 square foot EMS/Fire Vehicle Facility at MCAS Cherry Point. The facility was placed into operation in early 2012 to provide improved emergency services for the base.
PROJECT HIGHLIGHTS
-
Compliance with US Government project delivery procedures.
-
LEED® Gold Certification
-
Incorporation of Anti-Terrorism Force Protection (ATFP) measures in accordance with UFC 4-010-01.
-
Use of bio-retention as a major component of the site design to comply with Low Impact Development (LID) and NC DENR water quality requirements.
![]() | ![]() | ![]() |
---|