Eno River State Park

Durham, North Carolina

Buckquarter Creek Trail Improvements

        GFBA provided design, site construction documents, and construction administration for the relocation of an existing trail along the Eno River in an area which had been a mill pond including new trail construction totaling 1,100-feet and obliteration of portions of the existing trail totaling 1,015-feet.  Construction included sidehill trail benching, natural soil surfacing, underdrains, rock cribwalls, rock steps, and large stone edging.

Trail Current Condition
Trail During Construction
Current Condition
Current Condition
During Construction
Current Condition
During Construction

George Finch | Boney and Associates

309 N. Boylan Ave, Raleigh, NC 27603

Phone: (919) 828-0588

Fax: (919) 834-3203

email: info@gfba.net