Eno River State Park
Durham, North Carolina
Buckquarter Creek Trail Improvements
GFBA provided design, site construction documents, and construction administration for the relocation of an existing trail along the Eno River in an area which had been a mill pond including new trail construction totaling 1,100-feet and obliteration of portions of the existing trail totaling 1,015-feet. Construction included sidehill trail benching, natural soil surfacing, underdrains, rock cribwalls, rock steps, and large stone edging.
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
---|---|---|---|---|---|---|
![]() | ![]() |